Feeds / US options

OPRA (consolidated US options)

Consolidated quotes and trades from every US options exchange (Options Price Reporting Authority). Consolidated book of each exchange's quote per option series, plus OPRA's Best Bid and Offer.

Handler built · spec-tested on synthetic data · not running liveUS Options

Protocol

Venue
Consolidated quotes and trades from every US options exchange (Options Price Reporting Authority)
Asset class
US Options
Wire format
OPRA Pillar output, binary v6 (specification 6.4c): big-endian blocks over multicast, fixed-length messages whose length follows from the category and the BBO indicator; prices with denominator codes.
Messages
Long / Short Equity and Index Quote with Best Bid and Offer appendages, Equity and Index Last Sale, Open Interest, End of Day Summary, Series Mapping, Underlying Value, Administrative, Start of Day, Line Integrity, Reset Block Sequence Number
Book
Consolidated book of each exchange's quote per option series, plus OPRA's Best Bid and Offer
Sequencing
Block sequence per line; A/B duplicates skipped, gaps reported; Start of Day, Line Integrity and Reset handled. Retransmission requests are not implemented yet.
Validation
Spec-tested 2026-11-20, not yet validated on OPRA data (no public OPRA captures). The handler, written from the OPRA 6.4c specification, was run against a synthetic session with long and short quotes, every Best Bid and Offer indicator code including double appendages, mixed price denominators, halted quotes, last sales with cancellations and late reports, sequence resets, duplicates and a dropped block; against a decoder we wrote independently, the consolidated book, every Best Bid and Offer update and every trade matched, with zero errors. Exchange-direct input: our production handler does not yet take live UDP multicast, so this handler runs on captures in our test tools today; live multicast input and gap recovery are in development.

Notes

Upcoming and recent changes

2026-11-17Action neededNew OPRA Dynamic Rebalance Symbol Distribution: confidence test Nov 21, activation Nov 23, 2026effective 2026-11-23Affects our handler
OPRA announced a confidence test on Saturday, November 21, 2026 and activation on Monday, November 23, 2026 for the new Dynamic Rebalance symbol distribution.
Details

Only the notice title is available. It points to a new symbol distribution across OPRA's multicast lines going live on November 23, 2026. Handlers that subscribe to specific multicast lines or map symbols to lines should check the full notice, update their symbol-to-line mapping, and join the November 21 confidence test.

Our handler: A change to how symbols are distributed across OPRA multicast lines affects the line subscriptions our handler uses.

Source ↗

2026-01-07Action neededDynamic Rebalance Symbol Distribution: industry tests and go-live Nov 23, 2026effective 2026-11-23Affects our handler
OPRA set industry tests and a go-live date of November 23, 2026 for the new Dynamic Rebalance symbol distribution.
Details

Only the notice title is available. The change alters how symbols are spread across multicast lines, with go-live on November 23, 2026. Plan for testing and for any line-mapping updates ahead of that date.

Our handler: Symbol-to-multicast-line distribution determines which lines our handler must consume.

Source ↗

2026-10-29InfoDynamic Rebalance Industry Test #4 on Oct 31, 2026 (reminder, updated)effective 2026-10-31May affect market data
OPRA updated its reminder for Industry Test #4 of the Dynamic Rebalance symbol distribution on Saturday, October 31, 2026.
Details

Only the title is available. This is an optional testing opportunity, and the date has already passed. It followed the earlier reminder on October 23.

Our handler: The test covers the symbol distribution across multicast lines that our handler consumes.

Source ↗

2026-10-26Action needed2027 testing schedule: failover to secondary data center and MWCB testingMay affect market data
OPRA published its 2027 schedule for failover to the secondary data center and market-wide circuit breaker (MWCB) testing.
Details

Only the title is available. Consuming handlers should review the schedule and plan to take part in failover tests, which exercise the secondary data center feed.

Our handler: Failover tests may switch the multicast feed to the secondary data center.

Source ↗

2026-10-26Info2027 OPRA testing blackout dates
OPRA published the dates in 2027 when testing will not be held.
Details

Only the title is available. Use these dates when planning any 2027 test activity.

Our handler: This is a testing calendar and does not change any feed, channel or message.

Source ↗

2026-09-16Action neededExtension of OPRA trading hours effective Sep 21, 2026effective 2026-09-21Affects our handler
OPRA gave notice that its trading hours are extended, effective September 21, 2026.
Details

Only the title is available. It follows earlier notices on June 1, June 15 and August 14. Handlers should check the new session times against their session-handling and end-of-day logic.

Our handler: Changed OPRA hours affect when Last Sale and quote messages and control messages are sent.

Source ↗

2026-09-08Action neededRTH hardware upgrade and new trading session identifier: confidence test Sep 19, activation Sep 21, 2026effective 2026-09-21Affects our handler
OPRA's Regular Trading Hours system hardware upgrade and new trading session identifier go live Monday, September 21, 2026, with a confidence test on Saturday, September 19.
Details

Only the title is available. A new trading session identifier is introduced alongside the hardware upgrade, which may change message content. Check the specification and test before activation.

Our handler: A new trading session identifier may change the format or content of the messages our handler decodes.

Source ↗

2026-08-19InfoDynamic Rebalance Industry Test #1 on Aug 29, 2026effective 2026-08-29May affect market data
OPRA offered an industry test of the new Dynamic Rebalance symbol distribution on Saturday, August 29, 2026.
Details

Only the title is available. The test date has already passed.

Our handler: The test covers the symbol distribution across multicast lines that our handler consumes.

Source ↗

Collected from the exchange's changelog and notices, summarized automatically; check the source before acting. All changes for this feed

Official documentation

OPRA Pillar output specification ↗cdn.opraplan.comOPRA document library ↗www.opraplan.com

Links go to the exchange's own documentation; it is theirs and may change. Our handler follows the version described above.

Interested?

This handler is not running in our public stack. It is built for clients with their own exchange connectivity and licences; live multicast input is in development.

Talk to us